cyclone

Rack Vortex

Rack Vortex Installation Schematic

Step-by-step docking and thermal integration guide for cold-aisle deployment.

Ambient Status 18.4°C
ac_unit

01. Floor Alignment

Ensure docking rails are parallel within ±0.5mm tolerance for secure unit locking.

02. Thermal Gasket

Verify compression seal along the chassis frame to eliminate air bypass.

03. Inspection Zone

Optical-grade plexiglass allows for visual inspection of flow indicators.

04. Airflow Intake

Primary cold-aisle intake port. Maintain 12-inch clearance for optimal CFM.

info Installation Steps

01

Positioning

Align Vortex unit to rack front rails.

02

Seal Verification

Check all thermal gasket contact points.

03

Integration

Lock unit into floor-mounted base.

Max CFM

1,200

Efficiency

99.2%

Gasket Sealing Guide

play_circle

Floor Alignment Specs

play_circle

Visual Inspection Points

play_circle